The size of the cooling tower will depend on the amount of heat to be removed from the acid dilution. Typically, this will be in the range of 20 to 100 tons per hour.
This package includes the tower, inside tank (required in climates with freezing temperatures), pump, water filters, and all instrumentation.
Since these systems are field installed, the owner is responsible for all site work, pipe, and fittings as required to complete the installation. |
 |